ZLJ5030TYHNJE5

Road maintenance vehicle ZLJ5030TYHNJE5
Overall dimensions (L×W×H):4980×1650×2085mm 
Chassis brand:Nanjing Iveco (China-V)
Chassis power:64kW

Packaging & Delivery

Wooden box

7-30 Days

Product features of ZLJ5030TYHNJE5

• The water tank in capacity of 2m3 allows >70min standard working time. 

• The upper and lower water filling ports and the front and rear tool boxes are provided to realize higher convenience and flexibility. 

• The double-cylinder gasoline engine features strong power, stable running, low vibration, and low working noise. 

• The high flow high pressure water pump features high cleaning efficiency. 

• The 25L large independent fuel tank allows >6h normal working time after being fully filled. 

• The double protection of special unloading starter switch + automatic discharge pilot valve guarantees the safe running of gasoline engine.  

• The automatic cleaning device with left and right independent angular spray nozzles realizes the cleaning of road curbs and road markings. 

• The standard equipment, including 15m automatic telescoping reel, fixed point cleaning device, front water spray holder, cleaning trolley, hand-held spray gun, and camera display screen, are installed. 

• With humanized operation settings, the auxiliary engine accelerator and the front water spray holder can be completely operated within the cab. 

  • Lifting height of front spray rod 100mm
  • Maximum pressure of high pressure water circuit system 15MPa
  • Maximum flow of high pressure water pump 50L/min
  • Cleaning width of auxiliary cleaning trolley 1.5m
  • Swing angle of front spray rod ±20°
  • Hose length of water hose reel 15 (Automatic retraction function)m
  • Cleaning width of front spray rod 1.5m
  • Cab configuration Heating and air conditioning system
  • Overall dimensions (L×W×H) 4980×1650×2085mm
  • Chassis brand Nanjing Iveco (China-V)
  • Maximum vehicle speed 95km/h
  • Auxiliary engine power 12kW
  • Chassis engine power 64kW
  • Water tank capacity 2m³

Inquiry