Overview
A climbing concrete placing boom mainly consists of the tower body, climbing frames, slewing mechanism, upper-lower pedestals, boom assembly, hydraulic system, electrical system, etc., and is suitable for the construction of high-rise buildings. It is fixed in the lift shafts or floor openings and climbs up by means of its climbing system or a tower crane, providing enhanced efficiency and quality of concrete placement and saving labor.
● Self-climbing type:
1). Self-climbing in the lift shafts: The placing boom climbs up along the lift shaft with the rising of the floors, with horizontal reaches of 28mand24m.
2). Self-climbing in the floor openings: The placing boom climbs up along the floor openings with the rising of the floors, with horizontal reaches of28m,24mand17m.
Model |
HGY32 |
|
Radius of placing boom |
32meter |
|
Section number |
4 |
|
Tower body type |
Tubular |
|
Tower body height |
8meter |
|
Hose |
φ125×3m |
|
Pipeline Diameter |
φ125×4mm |
|
Mode of drive |
Hydraulic |
|
Power of motor |
18 kW |
|
Pressure of hydraulic system |
31 MPa |
|
Rotation 、 Elevation angle |
360º、-4~90 º |
|
Mode of operation |
1. cable remote control 2. radio remote control |
|
Total weight |
20500kg |
|
Weight of the heaviest component |
8600 kg |
|
Wind speed |
Installation status |
V≤46km/h(13m/s) |
Working status |
V≤56km/h(16m/s) |
|
Standby status |
V≤72km/h(20m/s) |
|
Parked state |
V≤130km/h(36m/s) |
|
working temperature |
-20 ºC~+45 ºC |
|