Horizontal reach (m):13
Hydraulics output(kW):4
Hydraulics pressure(MPa):20
Wooden box
7-30 Days
2)The boom assembly’s luffing, folding/unfolding and swinging are carried out hydraulically with buttons. The hydraulic and electrical system feature overload protectors, flow controls, alarms, phase sequence protectors and so on, which ensures the placing boom to have reliable performance, easy and smooth operation, and high safety.
3)Featuring compact structure and lightweight, the placing boom can be completely lifted and transferred to any suitable places for concrete placement, such as floors, platforms, simply-structured racks or even trailers. It does not need to be fixed while working. In addition, it can be lifted off the placement sites when it is not needed, which leads to no disturbance to other jobs and easy maintenance.
4)The HGY13 is well fit for the construction of different floors and for complicated jobsites without being influenced by the size and shape of floors.
Model |
HGY13 |
|
Horizontal reach (m) |
13 |
|
Hydraulics output (kW) |
4 |
|
Hydraulics pressure (MPa) |
20 |
|
Rotation ( Elevation angle) |
360°(-2°~84.4°) |
|
Pipeline diameter (mm) |
125 |
|
Total weight (t) |
Without counterweight |
2.7 |
With counterweight |
4.3 |