It’s applicable for the engineering constructions of buildings, water conservancy projects, roads, ports, and buildings that require frequent site transfer and for the early stage concrete constructions of large projects.
Wooden box
7-30 Days
Model | HZSY50 | HZSY75 | |
Productivity(m3/h) | 50 | 75 | |
Main mixing unit | Model | JS1000 | JS1500 |
Mixing power(kW) | 2×18.5 | 2×30 | |
Discharge capacity(m3) | 1 | 1.5 | |
Aggregate size (gravel/pebble mm) | ≤60/80 | ≤60/80 | |
Material bin | Bin capacity(m3) | 8 | 8 |
Belt conveyor capacity(t/h) | 300 | 450 | |
Weighing range and metering accuracy | Aggregate(kg) | 2000±2% | 3000±2% |
Cement(kg) | 500±1% | 800±1% | |
Water(kg) | 200±1% | 300±1% | |
Additive(kg) | 20±1% | 20±1% | |
Discharge height(m) | 3.8 | 3.8 |